About Codenova
Codenova has been in business since 2022, delivering technology projects for clients. Their core services include Mobile App Development. With 10 - 49 people on staff, Codenova can take on projects of varying size. Projects are generally billed around < $25 / hr/hr. Codenova holds a 5.0-star rating across 1 client reviews. Codenova operates out of Surat, India. This profile is a starting point — reach out to Codenova directly to discuss project specifics.
Where We Specialize
Industry Expertise
Typical Project Size
Codenova Reviews
Write a ReviewA technology investment that delivered returns ahead of the business case we approved
Liselotte Bakker / Head of Platform Engineering - Harbour Digital BVJun 10, 2026
Project summary: Track-and-trace capability had gone from a differentiator to a table-stakes requirement and our platform had neither. We needed to close the gap before our next enterprise tender cycle.
I came into this engagement as a sceptic. We had been through a failed implementation with a previous vendor and I had high standards for what evidence of competence looked like before I would trust a partner with our core systems. This team earned that trust progressively — through the quality of the discovery documentation, the rigour of the technical proposals, the consistency of the sprint deliveries, and ultimately the stability of the production system. I no longer lead with scepticism when recommending them.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
CI/CD pipeline that transformed how our engineering team thinks about release risk
Cameron Aldrich / Head of Digital Operations - Northstar Logistics CorpMay 01, 2026
Project summary: A merger had left us with two incompatible student information systems. We needed a consolidation path that preserved historical data, maintained service continuity, and met accreditation requirements.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
Custom platform that our engineering team is still proud to maintain two years later
Rupert Ashford / Director of eCommerce - Hargrove Retail PLCApr 19, 2026
Project summary: Our mobile app had a 2.9-star average review score. The two themes in every negative review were speed and booking flow complexity — both were solvable with the right engineering partner.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
Managed IT that made our internal teams forget infrastructure was something they once worried about
Siobhan Gallagher / Chief Technology Officer - Northumbria FinTech LtdMar 26, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
Full-funnel programme that turned marketing from a cost argument into a revenue conversation
Ji-Woo Park / VP of Engineering - Seoul Digital CorpFeb 18, 2026
Project summary: Several years of incremental development had left us with a platform that was technically functional but strategically limiting. A structured rebuild was the agreed path forward.
Six months after go-live our platform is processing three times the transaction volume we specified in the original brief. The architecture choices made during discovery accommodated that growth without remediation work. That is the difference between a team that designs for what you tell them and a team that designs for what you are likely to need. We are in conversation about a Phase 2 engagement and I expect to be using this partnership for several years.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
QA coverage that finally made Friday deployments feel like a professional activity
Jia Hui Tan / VP of Engineering - RedDot Technologies Pte LtdJan 27, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
Design system that brought consistency to a product that had accrued four years of visual debt
Dominic Fairfax / Head of Digital Transformation - Arcadian Consulting LtdJan 23, 2026
Project summary: Unplanned downtime had become our single largest cost driver and our data showed that predictive maintenance could address the majority of it — if we had the right infrastructure to act on it.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it