About Designhole
Designhole works with clients to plan, build, and ship digital products. Designhole focuses on UI/UX Design. Designhole employs 10 - 49 people. Minimum project size is generally around $5,000+. This gives a quick snapshot of what to expect when working with Designhole.
Where We Specialize
Industry Expertise
Typical Project Size
Designhole Reviews
Write a ReviewThe outcome we specified, delivered the way we needed it, by people we would hire again
Declan Hartley / Chief Digital Officer - Southern Cross TechnologyMay 28, 2026
Project summary: Our connected vehicle platform needed to handle telemetry data from an expanding EV fleet while supporting over-the-air update orchestration. No off-the-shelf platform handled both requirements well.
I came into this engagement as a sceptic. We had been through a failed implementation with a previous vendor and I had high standards for what evidence of competence looked like before I would trust a partner with our core systems. This team earned that trust progressively — through the quality of the discovery documentation, the rigour of the technical proposals, the consistency of the sprint deliveries, and ultimately the stability of the production system. I no longer lead with scepticism when recommending them.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
Sales visibility we had been requesting for three years, delivered in fourteen weeks
Siobhan Gallagher / Chief Technology Officer - Northumbria FinTech LtdMay 13, 2026
Project summary: Multi-touch attribution across our media mix had become the most-requested capability from every client in our portfolio. We could not deliver it without rebuilding our data layer.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
Gameplay feel that matched the design intent precisely — a harder achievement than most realise
Beatriz Cavalcanti / Chief Digital Officer - Cerrado Tech SAMay 04, 2026
Project summary: First notice of loss processing was taking three days on average. Market benchmarks were under four hours. Automation of the intake and triage workflow was the agreed priority.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
App store launch with a four-point-eight average rating in the first month
Radosław Kowalczyk / Head of Development - Wisła Software Sp zooMar 06, 2026
Project summary: The project had a board-facing delivery date tied to a strategic initiative. We needed a partner who would treat that date as their own, not ours.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
CRM integration that connected our marketing automation to our revenue motion seamlessly
Nora Al-Otaibi / VP of Engineering - Salam Digital SolutionsFeb 13, 2026
Project summary: Our agents were spending more time managing data across disconnected systems than managing relationships. We needed a unified platform to give them that time back.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
E-commerce build that united our digital and in-store inventory for the first time
Reuben Loh / CTO - Marina Bay Ventures Pte LtdJan 16, 2026
Project summary: Our trading platform had been extended incrementally for seven years. Latency was degrading, technical debt was compounding, and a clean rebuild was no longer optional.
Our stakeholder group included board members, clinical leads, compliance officers, and end users — each with different technical literacy and different success criteria. This team navigated that stakeholder landscape as well as any vendor I have seen. They adjusted their communication register depending on the audience without losing the substance. They managed expectations honestly throughout. And they delivered a system that each group can point to as meeting their requirements. That breadth is genuinely uncommon.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project