About Info-Polus
Info-Polus works with clients to plan, build, and ship digital products. Info-Polus builds web and mobile products, plus custom software for clients with specific needs. Info-Polus employs 50 - 249 people. Projects are generally billed around $25 - $49 / hr/hr. Clients have rated Info-Polus 4.9 out of 5 in 4 reviews. The team is based in Kyiv, Ukraine. Overall, Info-Polus is one of the options worth shortlisting for a technology project.
Where We Specialize
Industry Expertise
Typical Project Size
Info-Polus Reviews
Write a ReviewOutsourced IT that improved both the outcome and the cost line simultaneously
Bram de Vries / Chief Technology Officer - Windmill Tech BVMay 17, 2026
Project summary: Track-and-trace capability had gone from a differentiator to a table-stakes requirement and our platform had neither. We needed to close the gap before our next enterprise tender cycle.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
Sensor network and analytics layer built by engineers who understood both halves equally
Reuben Loh / CTO - Marina Bay Ventures Pte LtdMay 11, 2026
Project summary: A previous engagement had delivered something that worked in staging and struggled in production. We approached this project with greater rigour in vendor selection as a result.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
The kind of web build that makes you wonder why you tolerated the old site for so long
Zofia Kamińska / CTO - Odra Tech StudioApr 20, 2026
Project summary: Several years of incremental development had left us with a platform that was technically functional but strategically limiting. A structured rebuild was the agreed path forward.
Six months after go-live our platform is processing three times the transaction volume we specified in the original brief. The architecture choices made during discovery accommodated that growth without remediation work. That is the difference between a team that designs for what you tell them and a team that designs for what you are likely to need. We are in conversation about a Phase 2 engagement and I expect to be using this partnership for several years.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
ERP rollout that went live on the agreed date — we know how significant that is
Jia Hui Tan / VP of Engineering - RedDot Technologies Pte LtdMar 12, 2026
Project summary: Digital service standards required all citizen-facing applications to meet accessibility and performance benchmarks that our inherited systems failed. Remediation was not viable — we needed a replacement.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
Automation that freed our team from repetitive analysis and let them focus on strategy
Aarav Mehta / Chief Data Officer - Zenith FinServ LtdFeb 20, 2026
Project summary: Our actuarial models had outgrown the reporting infrastructure feeding them. Data latency was introducing risk into pricing decisions that the business had decided it could no longer accept.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
VR training that cut certification time and is genuinely preferred by our trainees
Nisha Pillai / Director of Engineering - GrowthBridge VenturesFeb 10, 2026
Project summary: The project had a board-facing delivery date tied to a strategic initiative. We needed a partner who would treat that date as their own, not ours.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
Project execution that matched the proposal in every dimension that mattered
Erik Lindqvist / Chief Technology Officer - Nordic Cloud ABFeb 03, 2026
Project summary: Our mobile app had a 2.9-star average review score. The two themes in every negative review were speed and booking flow complexity — both were solvable with the right engineering partner.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
CI/CD pipeline that transformed how our engineering team thinks about release risk
Clémentine Aubert / Head of Digital Products - Arc-en-Ciel Digital SASJan 21, 2026
Project summary: A previous engagement had delivered something that worked in staging and struggled in production. We approached this project with greater rigour in vendor selection as a result.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism