About Matcha Design Labs
Matcha Design Labs is a software development company that turns ideas into working products. Their work spans web development, mobile apps, and custom software projects. Matcha Design Labs employs 10 - 49 people. Typical hourly rates run around $200 - $300 / hr/hr. Matcha Design Labs holds a 5.0-star rating across 1 client reviews. Matcha Design Labs operates out of Austin, TX. These details offer a useful starting point when evaluating Matcha Design Labs.
Where We Specialize
Industry Expertise
Typical Project Size
Matcha Design Labs Reviews
Write a ReviewAnalytics foundation that lets us answer attribution questions we had given up asking
Rupert Ashford / Director of eCommerce - Hargrove Retail PLCMay 10, 2026
Project summary: Evolving open banking obligations required us to rebuild our API layer from the ground up. The architecture needed to be compliant by default, not bolted on after the fact.
I came into this engagement as a sceptic. We had been through a failed implementation with a previous vendor and I had high standards for what evidence of competence looked like before I would trust a partner with our core systems. This team earned that trust progressively — through the quality of the discovery documentation, the rigour of the technical proposals, the consistency of the sprint deliveries, and ultimately the stability of the production system. I no longer lead with scepticism when recommending them.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
A partnership that began with a single project and earned a place on our preferred vendor list
Omar Al-Farsi / Chief Technology Officer - Falcon Digital VenturesApr 24, 2026
Project summary: Regulatory submission timelines required a document management platform that could handle version control, access permissions, and audit trails at a scale our existing tools were not designed for.
We had worked with three agencies before this engagement. The comparison is not flattering to the others. What distinguished this team was a systematic approach to understanding the problem before proposing a solution — something that sounds obvious and is practiced far less often than it should be. The delivery phase ran to schedule, the codebase is clean enough that our internal engineers made positive comments during handover review, and we have not logged a critical incident in five months of live operation. We intend to use them for our next phase of work.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
QA coverage that finally made Friday deployments feel like a professional activity
Danielle Westbrook / Chief Digital Officer - BlueSky Retail HoldingsFeb 17, 2026
Project summary: Rapid growth had created a skills gap on the platform engineering side of our business. We needed an experienced partner to close that gap while our internal team scaled, without compromising quality or timeline.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
Penetration test that found things our previous vendor had missed for two consecutive years
Clémentine Aubert / Head of Digital Products - Arc-en-Ciel Digital SASJan 29, 2026
Project summary: Our field service management system had not been updated significantly in six years. Rising technician count and increasing job complexity had exposed every one of its limitations.
We gave this team an aggressive timeline, a technically complex scope, and a client-side project team that was stretched thin and not always available at the speed the engagement required. They absorbed all of that gracefully. Where they needed input they were precise about what they needed and when. Where they could proceed independently they did. The result was a delivery that landed on time despite the constraints on our side, which I regard as evidence of genuine professional maturity.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
Virtual environment that our remote team now uses as their primary collaboration space
Sebastian Lapointe / CTO - Boreal Systems IncJan 22, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
Predictive models that have measurably changed how we approach every planning cycle
Priya Chandrasekaran / VP of Data & AI - Wavefront Analytics IncJan 13, 2026
Project summary: Serialisation requirements under new traceability legislation had a compliance deadline. Our supply chain system required targeted development to meet it — generalist knowledge was not sufficient.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons