About NOTUM Technologies
NOTUM Technologies has been in business since 2018, delivering technology projects for clients. Their core services include Mobile App Development. Its team includes 10 - 49 specialists working across design, development, and delivery. Projects are generally billed around $50 - $99 / hr/hr. Clients have rated NOTUM Technologies 5.0 out of 5 in 15 reviews. Their home base is Brno, Czech Republic. This profile is a starting point — reach out to NOTUM Technologies directly to discuss project specifics.
Where We Specialize
Industry Expertise
Typical Project Size
NOTUM Technologies Reviews
Write a ReviewIT partner embedded deeply enough to understand our business, not just our ticket queue
Maja Söderström / Head of Product Engineering - Scandia Digital ABJun 06, 2026
Project summary: Our mobile app had a 2.9-star average review score. The two themes in every negative review were speed and booking flow complexity — both were solvable with the right engineering partner.
I came into this engagement as a sceptic. We had been through a failed implementation with a previous vendor and I had high standards for what evidence of competence looked like before I would trust a partner with our core systems. This team earned that trust progressively — through the quality of the discovery documentation, the rigour of the technical proposals, the consistency of the sprint deliveries, and ultimately the stability of the production system. I no longer lead with scepticism when recommending them.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
Real-time dashboards that our executives now open before any other application
Nathan Prescott / VP of Technology - Ironclad Insurance GroupJun 05, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
What made the most difference in practice was the quality of the engineering judgment on this team. Not the ability to execute a specification — that is a baseline expectation. The ability to recognise when a specification was suboptimal, explain why, propose an alternative, and support the client in making a decision about it. That consultative dimension elevated the output beyond what the brief described and resulted in a product that is more fit for purpose than the one we had originally specified.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
Project execution that matched the proposal in every dimension that mattered
Zofia Kamińska / CTO - Odra Tech StudioApr 23, 2026
Project summary: Cross-agency data sharing had been blocked by incompatible systems for four years. A secure integration platform was the prerequisite for every transformation initiative in our roadmap.
We had worked with three agencies before this engagement. The comparison is not flattering to the others. What distinguished this team was a systematic approach to understanding the problem before proposing a solution — something that sounds obvious and is practiced far less often than it should be. The delivery phase ran to schedule, the codebase is clean enough that our internal engineers made positive comments during handover review, and we have not logged a critical incident in five months of live operation. We intend to use them for our next phase of work.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
Responsive, accessible, and fast — every standard met, every deadline hit
Jia Hui Tan / VP of Engineering - RedDot Technologies Pte LtdApr 14, 2026
Project summary: Our trading platform had been extended incrementally for seven years. Latency was degrading, technical debt was compounding, and a clean rebuild was no longer optional.
Six months after go-live our platform is processing three times the transaction volume we specified in the original brief. The architecture choices made during discovery accommodated that growth without remediation work. That is the difference between a team that designs for what you tell them and a team that designs for what you are likely to need. We are in conversation about a Phase 2 engagement and I expect to be using this partnership for several years.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
Web platform that turned our digital presence from a cost centre into a revenue driver
Siobhan Gallagher / Chief Technology Officer - Northumbria FinTech LtdMar 05, 2026
Project summary: Several years of incremental development had left us with a platform that was technically functional but strategically limiting. A structured rebuild was the agreed path forward.
Six months after go-live our platform is processing three times the transaction volume we specified in the original brief. The architecture choices made during discovery accommodated that growth without remediation work. That is the difference between a team that designs for what you tell them and a team that designs for what you are likely to need. We are in conversation about a Phase 2 engagement and I expect to be using this partnership for several years.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
Zero-trust implementation that satisfied our enterprise client security questionnaire first pass
Nora Al-Otaibi / VP of Engineering - Salam Digital SolutionsFeb 19, 2026
Project summary: Warehouse management inefficiencies were adding cost and introducing errors at a rate that was becoming visible to clients. A modernised WMS was the agreed solution internally — we needed a partner to build it.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project