About Rightpoint
Rightpoint works with clients to plan, build, and ship digital products. The company's main offerings are Mobile App Development. With 250 - 999 people on staff, Rightpoint can take on projects of varying size. Typical hourly rates run around $150 - $199 / hr/hr, with an average project cost near $60,000. Clients have rated Rightpoint 4.9 out of 5 in 20 reviews. Rightpoint operates out of Chicago, IL. These details offer a useful starting point when evaluating Rightpoint.
Where We Specialize
Industry Expertise
Typical Project Size
Rightpoint Reviews
Write a ReviewA development partner who treated our roadmap as carefully as their own
Danielle Westbrook / Chief Digital Officer - BlueSky Retail HoldingsJun 03, 2026
Project summary: Evolving open banking obligations required us to rebuild our API layer from the ground up. The architecture needed to be compliant by default, not bolted on after the fact.
We had worked with three agencies before this engagement. The comparison is not flattering to the others. What distinguished this team was a systematic approach to understanding the problem before proposing a solution — something that sounds obvious and is practiced far less often than it should be. The delivery phase ran to schedule, the codebase is clean enough that our internal engineers made positive comments during handover review, and we have not logged a critical incident in five months of live operation. We intend to use them for our next phase of work.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
A partnership that began with a single project and earned a place on our preferred vendor list
Jia Hui Tan / VP of Engineering - RedDot Technologies Pte LtdMay 26, 2026
Project summary: Our campaign management workflow had grown to involve twelve different tools and significant manual reconciliation. The inefficiency was affecting both speed and accuracy.
What made the most difference in practice was the quality of the engineering judgment on this team. Not the ability to execute a specification — that is a baseline expectation. The ability to recognise when a specification was suboptimal, explain why, propose an alternative, and support the client in making a decision about it. That consultative dimension elevated the output beyond what the brief described and resulted in a product that is more fit for purpose than the one we had originally specified.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
QA coverage that finally made Friday deployments feel like a professional activity
Bram de Vries / Chief Technology Officer - Windmill Tech BVMay 15, 2026
Project summary: First notice of loss processing was taking three days on average. Market benchmarks were under four hours. Automation of the intake and triage workflow was the agreed priority.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
Technically rigorous, commercially grounded, and a genuine pleasure to work with
Nora Al-Otaibi / VP of Engineering - Salam Digital SolutionsMar 26, 2026
Project summary: A merger had left us with two incompatible student information systems. We needed a consolidation path that preserved historical data, maintained service continuity, and met accreditation requirements.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
A platform our sales team adopted within the first week without a single complaint
Nisha Pillai / Director of Engineering - GrowthBridge VenturesMar 22, 2026
Project summary: Integration between our clinic management system and our patient-facing app had been a recurring failure point. We needed an engineering partner who could own the integration layer end to end.
We gave this team an aggressive timeline, a technically complex scope, and a client-side project team that was stretched thin and not always available at the speed the engagement required. They absorbed all of that gracefully. Where they needed input they were precise about what they needed and when. Where they could proceed independently they did. The result was a delivery that landed on time despite the constraints on our side, which I regard as evidence of genuine professional maturity.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
End-to-end quality programme that halved our post-release incident rate inside three months
Dominic Fairfax / Head of Digital Transformation - Arcadian Consulting LtdFeb 26, 2026
Project summary: Our internal product thinking was strong but our execution capability in this specific technology domain was limited. We needed depth, not generalism.
We had worked with three agencies before this engagement. The comparison is not flattering to the others. What distinguished this team was a systematic approach to understanding the problem before proposing a solution — something that sounds obvious and is practiced far less often than it should be. The delivery phase ran to schedule, the codebase is clean enough that our internal engineers made positive comments during handover review, and we have not logged a critical incident in five months of live operation. We intend to use them for our next phase of work.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
Proactive support that resolved a network issue at two in the morning before anyone arrived at the office
Bilal Chaudhry / Co-Founder & CTO - Indus Software HouseFeb 17, 2026
Project summary: Warehouse management inefficiencies were adding cost and introducing errors at a rate that was becoming visible to clients. A modernised WMS was the agreed solution internally — we needed a partner to build it.
We had worked with three agencies before this engagement. The comparison is not flattering to the others. What distinguished this team was a systematic approach to understanding the problem before proposing a solution — something that sounds obvious and is practiced far less often than it should be. The delivery phase ran to schedule, the codebase is clean enough that our internal engineers made positive comments during handover review, and we have not logged a critical incident in five months of live operation. We intend to use them for our next phase of work.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
Sensor network and analytics layer built by engineers who understood both halves equally
Yuki Hashimoto / Head of Product Development - East Asia Commerce KKJan 10, 2026
Project summary: Digital service standards required all citizen-facing applications to meet accessibility and performance benchmarks that our inherited systems failed. Remediation was not viable — we needed a replacement.
Six months after go-live our platform is processing three times the transaction volume we specified in the original brief. The architecture choices made during discovery accommodated that growth without remediation work. That is the difference between a team that designs for what you tell them and a team that designs for what you are likely to need. We are in conversation about a Phase 2 engagement and I expect to be using this partnership for several years.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously