About Roller Agency
Roller Agency is a software development company that turns ideas into working products. The company's main offerings are UI/UX Design and Mobile App Development. Its team includes 10 - 49 specialists working across design, development, and delivery. Typical hourly rates run around $150 - $199 / hr/hr. The team is based in Nottingham, England. This gives a quick snapshot of what to expect when working with Roller Agency.
Where We Specialize
Industry Expertise
Typical Project Size
Roller Agency Reviews
Write a ReviewThe outcome we specified, delivered the way we needed it, by people we would hire again
Ji-Woo Park / VP of Engineering - Seoul Digital CorpMay 22, 2026
Project summary: Customer expectations had reset and our conversion funnel data showed precisely where we were losing them. We needed a commerce platform capable of delivering the experience our competitors already had.
We had worked with three agencies before this engagement. The comparison is not flattering to the others. What distinguished this team was a systematic approach to understanding the problem before proposing a solution — something that sounds obvious and is practiced far less often than it should be. The delivery phase ran to schedule, the codebase is clean enough that our internal engineers made positive comments during handover review, and we have not logged a critical incident in five months of live operation. We intend to use them for our next phase of work.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
Smart infrastructure project that paid back the investment in under two quarters
Omar Al-Farsi / Chief Technology Officer - Falcon Digital VenturesApr 10, 2026
Project summary: Our internal product thinking was strong but our execution capability in this specific technology domain was limited. We needed depth, not generalism.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
Mixed reality build that landed exactly where the brief pointed and then went further
Sabrina Vollmer / Chief Innovation Officer - Rheintal Digital AGApr 02, 2026
Project summary: A merger had left us with two incompatible student information systems. We needed a consolidation path that preserved historical data, maintained service continuity, and met accreditation requirements.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
Web platform that turned our digital presence from a cost centre into a revenue driver
Vikram Srinivasan / Head of Platform - Cascade EdTech SolutionsMar 17, 2026
Project summary: A previous engagement had delivered something that worked in staging and struggled in production. We approached this project with greater rigour in vendor selection as a result.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
QA coverage that finally made Friday deployments feel like a professional activity
Hyun-Su Lim / Director of Platform - Hanam Tech SolutionsMar 17, 2026
Project summary: Rapid growth had created a skills gap on the platform engineering side of our business. We needed an experienced partner to close that gap while our internal team scaled, without compromising quality or timeline.
What made the most difference in practice was the quality of the engineering judgment on this team. Not the ability to execute a specification — that is a baseline expectation. The ability to recognise when a specification was suboptimal, explain why, propose an alternative, and support the client in making a decision about it. That consultative dimension elevated the output beyond what the brief described and resulted in a product that is more fit for purpose than the one we had originally specified.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
Custom pipeline configuration that maps exactly to how our team actually sells
Zofia Kamińska / CTO - Odra Tech StudioFeb 23, 2026
Project summary: A previous engagement had delivered something that worked in staging and struggled in production. We approached this project with greater rigour in vendor selection as a result.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
ERP rollout that went live on the agreed date — we know how significant that is
Siobhan Gallagher / Chief Technology Officer - Northumbria FinTech LtdFeb 09, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
We had worked with three agencies before this engagement. The comparison is not flattering to the others. What distinguished this team was a systematic approach to understanding the problem before proposing a solution — something that sounds obvious and is practiced far less often than it should be. The delivery phase ran to schedule, the codebase is clean enough that our internal engineers made positive comments during handover review, and we have not logged a critical incident in five months of live operation. We intend to use them for our next phase of work.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
VR training that cut certification time and is genuinely preferred by our trainees
Fatima Al-Suwaidi / Head of Digital Strategy - Gulf FinTech HoldingsJan 31, 2026
Project summary: Digital-first buyer behaviour had made our property search experience a genuine competitive liability. We needed it to match the quality of the portfolio it was representing.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project