About Uppercut
Uppercut works with clients to plan, build, and ship digital products. Their core services include Mobile App Development and Web Development. Uppercut employs 10 - 49 people. Typical hourly rates run around $100 - $149 / hr/hr. Uppercut operates out of Calgary, Canada. Overall, Uppercut is one of the options worth shortlisting for a technology project.
Where We Specialize
Industry Expertise
Typical Project Size
Uppercut Reviews
Write a ReviewUser research that uncovered friction we had stopped noticing because it was always there
Rupert Ashford / Director of eCommerce - Hargrove Retail PLCMay 25, 2026
Project summary: Our internal product thinking was strong but our execution capability in this specific technology domain was limited. We needed depth, not generalism.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
Software that solved the actual problem rather than the stated one — a crucial difference
Eoghan Fitzgerald / VP of Engineering - Shannon Tech Solutions LtdMay 12, 2026
Project summary: Our actuarial models had outgrown the reporting infrastructure feeding them. Data latency was introducing risk into pricing decisions that the business had decided it could no longer accept.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
Gameplay feel that matched the design intent precisely — a harder achievement than most realise
Yuki Hashimoto / Head of Product Development - East Asia Commerce KKMay 10, 2026
Project summary: A merger had left us with two incompatible student information systems. We needed a consolidation path that preserved historical data, maintained service continuity, and met accreditation requirements.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
A technology investment that delivered returns ahead of the business case we approved
Victoria Haines / Chief Product Officer - Solaris Media GroupApr 14, 2026
Project summary: An international expansion required multi-currency, multi-language, and multi-warehouse capabilities that our existing platform could not support without a fundamental re-architecture.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
Sensor network and analytics layer built by engineers who understood both halves equally
Matthieu Renard / Directeur Technique - Lumière Technologies SASMar 19, 2026
Project summary: Warehouse management inefficiencies were adding cost and introducing errors at a rate that was becoming visible to clients. A modernised WMS was the agreed solution internally — we needed a partner to build it.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
Service desk that outperformed our previous in-house team on every SLA we tracked
Nisha Pillai / Director of Engineering - GrowthBridge VenturesMar 15, 2026
Project summary: Integration between our clinic management system and our patient-facing app had been a recurring failure point. We needed an engineering partner who could own the integration layer end to end.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
Smart contract implementation rigorous enough to satisfy both our legal and security teams
Dominic Fairfax / Head of Digital Transformation - Arcadian Consulting LtdJan 09, 2026
Project summary: Track-and-trace capability had gone from a differentiator to a table-stakes requirement and our platform had neither. We needed to close the gap before our next enterprise tender cycle.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project