About Yummygum
Yummygum has been in business since 2009, delivering technology projects for clients. Yummygum focuses on Mobile App Development and UI/UX Design. With 10 - 49 people on staff, Yummygum can take on projects of varying size. Typical hourly rates run around $100 - $149 / hr/hr. Yummygum holds a 5.0-star rating across 4 client reviews. Their home base is Amsterdam, Netherlands. This profile is a starting point — reach out to Yummygum directly to discuss project specifics.
Where We Specialize
Industry Expertise
Typical Project Size
Yummygum Reviews
Write a ReviewMachine learning in production that the board could see working within eight weeks
Reuben Loh / CTO - Marina Bay Ventures Pte LtdJun 07, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
We had worked with three agencies before this engagement. The comparison is not flattering to the others. What distinguished this team was a systematic approach to understanding the problem before proposing a solution — something that sounds obvious and is practiced far less often than it should be. The delivery phase ran to schedule, the codebase is clean enough that our internal engineers made positive comments during handover review, and we have not logged a critical incident in five months of live operation. We intend to use them for our next phase of work.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
Observability stack that caught three production issues before any user reported them
Nathan Prescott / VP of Technology - Ironclad Insurance GroupJun 05, 2026
Project summary: As a technology business ourselves we apply the same scrutiny to our vendor selection that our clients apply to us. We needed a delivery partner who could meet a standard we would be comfortable being measured against.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
AR integration that increased session length by 35 percent within the first month
Gustavo Ferreira / VP of Technology - Amazônia Digital LtdaApr 14, 2026
Project summary: Digital-first buyer behaviour had made our property search experience a genuine competitive liability. We needed it to match the quality of the portfolio it was representing.
I came into this engagement as a sceptic. We had been through a failed implementation with a previous vendor and I had high standards for what evidence of competence looked like before I would trust a partner with our core systems. This team earned that trust progressively — through the quality of the discovery documentation, the rigour of the technical proposals, the consistency of the sprint deliveries, and ultimately the stability of the production system. I no longer lead with scepticism when recommending them.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
Tokenisation project that went from whitepaper to mainnet without a single major incident
Clémentine Aubert / Head of Digital Products - Arc-en-Ciel Digital SASApr 11, 2026
Project summary: The project had a board-facing delivery date tied to a strategic initiative. We needed a partner who would treat that date as their own, not ours.
What made the most difference in practice was the quality of the engineering judgment on this team. Not the ability to execute a specification — that is a baseline expectation. The ability to recognise when a specification was suboptimal, explain why, propose an alternative, and support the client in making a decision about it. That consultative dimension elevated the output beyond what the brief described and resulted in a product that is more fit for purpose than the one we had originally specified.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
Platform engineering work that let our product teams move independently at last
Kelsey Drummond / Director of Digital Health - Crestline Health PartnersApr 10, 2026
Project summary: Our client portal had been built in 2017 and had not received meaningful investment since. Clients were contrasting it unfavourably with the portals of our competitors in pitches.
Six months after go-live our platform is processing three times the transaction volume we specified in the original brief. The architecture choices made during discovery accommodated that growth without remediation work. That is the difference between a team that designs for what you tell them and a team that designs for what you are likely to need. We are in conversation about a Phase 2 engagement and I expect to be using this partnership for several years.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
A DevOps engagement that delivered cultural change as well as technical change
Siobhan Gallagher / Chief Technology Officer - Northumbria FinTech LtdMar 30, 2026
Project summary: Our internal product thinking was strong but our execution capability in this specific technology domain was limited. We needed depth, not generalism.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
A QA partner who treated our product quality as a personal responsibility
Vikram Srinivasan / Head of Platform - Cascade EdTech SolutionsMar 25, 2026
Project summary: Time-to-market for new tariff structures had become a direct competitive disadvantage. Our product configuration layer was the bottleneck and it needed to be modernised as a priority.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
Analytics foundation that lets us answer attribution questions we had given up asking
Matthieu Renard / Directeur Technique - Lumière Technologies SASJan 13, 2026
Project summary: Several years of incremental development had left us with a platform that was technically functional but strategically limiting. A structured rebuild was the agreed path forward.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it